Laminate Flooring · Click-Lock System

Laminate Installation Guidelines

Müller Graff laminate flooring uses a precision click-lock floating system. The installer is responsible for ensuring all conditions are met before, during, and after installation.

Section 01

General Overview

Laminate flooring is installed as a floating floor — it is not attached to the subfloor.

  • Floating installation only — do not nail, staple, or glue to subfloor
  • Click-lock system — no adhesive needed between planks
  • Store laminate on-site 72 hours before installation at 40–70% RH and 15–30°C
  • Document site temperature and RH before and during installation
Without documented acclimation conditions, future warranty claims may be denied.
Section 02

Jobsite Conditions

ConditionRequirement
Indoor Temperature59°F – 86°F (15°C – 30°C)
Relative Humidity40% – 70% RH
BuildingFully enclosed — HVAC operational
Acclimation72 hours minimum on-site
Section 03

Subfloor Requirements

Subfloor flatness is the #1 cause of laminate failures.
RequirementSpecification
Flatness3/16" in 10 ft (4.76mm in 3m) — CRITICAL
Concrete SubfloorFully cured (60+ days), moisture tested
Wood SubfloorStructurally sound, clean, dry
Existing FlooringCan install over most hard surfaces if flat
CarpetMust be removed — cannot install over carpet

Moisture Testing

Subfloor TypeTest MethodMax Allowed
ConcreteCM Test (calcium chloride)≤ 3 lbs / 1000 sq ft / 24 hrs
ConcreteRH Test (in-situ probe)≤ 75% RH
WoodPin-type moisture meter≤ 12% MC
Section 04

Underlayment

SubfloorUnderlaymentVapor Barrier
ConcreteRequired — foam or corkRequired — 6 mil polyethylene
Wood (above grade)Required — foam or corkNot required (can trap moisture)
Wood (below grade)Required — foam or corkRequired — 6 mil polyethylene
If installed over concrete, a 6 mil polyethylene vapor barrier must be added. Over wood, do NOT use a vapor barrier.
Section 05

Installation Steps

First Row

  • Start from the left corner of the room, tongue side facing the wall
  • Place 1/4" spacers between the plank and all walls
  • Cut the last plank to fit — remaining piece starts the next row (if ≥ 12")

Click System

  • Angle the long side into the previous row at approximately 20–30°
  • Press down to click into place — do not force
  • Tap the short end gently with a tapping block if needed
  • Never use a hammer directly on the plank edge

Staggering

  • Stagger end joints by a minimum of 12 inches between rows
  • Random stagger pattern is recommended for natural appearance
  • Avoid H-patterns — they weaken the floor and look unnatural

Final Row

  • Measure and cut the final row to fit — maintain 1/4" gap
  • Use a pull bar to engage the click system on the last row
  • Ensure all spacers remain in place until installation is complete
Section 06

Expansion Rules

LocationRequirement
All Walls1/4" minimum expansion gap
Fixed Objects1/4" gap around pipes, columns, door frames
Large RoomsTransition molding required every 40 ft (12m)
DoorwaysT-molding transition required
Room ChangesTransition at every room-to-room connection
Never pin the floor against walls or fixed objects. Cover expansion gaps with baseboard — do not fill with caulk or adhesive.
Section 07

Special Conditions

ConditionRequirement
Rolling ChairsSoft rubber casters (Type W) required
WheelchairsProtective mat required in areas of regular wheelchair use
KitchensWipe spills immediately — do not allow standing water at joints
BathroomsNot recommended — high moisture risk
Radiant HeatHydronic only — surface temp must not exceed 80°F (27°C)
Section 08

After Installation

  • Remove all spacers after installation is complete
  • Install baseboard moldings to cover expansion gaps (attach to wall, not floor)
  • Allow 24 hours before placing heavy furniture
  • Maintain 40–70% RH and 59–86°F after installation
  • Use felt pads on all furniture legs immediately

Reference: Müller Graff Laminate Installation Guidelines | NALFA Standards.

This website uses cookies to improve your experience and analyze site traffic.